1
/
of
7
Moradahaus
Cobalt Blue Glass Bud Vase Small Flower Vase Mini Bottle with Cork Wire Handle Design for Deco Cafes, Office Table, Home and Garden(Set 5)
Cobalt Blue Glass Bud Vase Small Flower Vase Mini Bottle with Cork Wire Handle Design for Deco Cafes, Office Table, Home and Garden(Set 5)
Regular price
$51.99 USD
Regular price
Sale price
$51.99 USD
Shipping calculated at checkout.
Quantity
Couldn't load pickup availability
About This
- Flower vase:Set of 5 round vases in different Textured, 4" high, 2.4" diameter, we have extra with twine, silver metal handle, empty greeting card, and cork stopper, this is a versatile glass Bottles (bubble, vertical stripes, etc. classic timeless patterns on each small vase bottle make them elegant and beautiful
- Beautiful Vase: You will love the 5 cobalt blue vase set. Have it for your own or send as a surprise on Mother's Day, Thanksgiving, Anniversaries, Weddings or Housewarmings. Just fill them with gorgeous and colorful fresh or artificial flowers
- Bud VASE : In a range of shapes resembling the tiny apothecary bottles of the past, round vase easily adapt to any decorating scheme, making them ideal centerpieces for weddings, dinner parties, and other special events
- Retro Glass Vase:Antique vintage bottles on a shelf or table to add class to your space.Textured ribbed in round vase body,it can hanging vase for wall vases table vase,gothic vase,spring family bud vases set,nordic vase,trumpet vase boho vase wire vase
- VARIETY OF SHAPE: Each unique mini rustic vase with a different design, These small glass vase are best suited for displaying a single stem or reed diffuser sticks. They are also charming enough to be left empty and appreciate on their own. Create your own vase decor display by mixing and matching the different styles of vases
Overview
- Material : Glass
- Color : Cobalt Blue
- Product Dimensions : 2.36"L x 2.36"W x 3.93"H
- Shape : Body,Bottle,Round,Trumpet
Share
